Виконання будівельно-монтажних робіт з реконструкції обладнання ПС 110/35/6 кВ «Чумка» (2 Черга), м. Одеса, вул. Транспортна, 3

ІП 2018 І. Будівництво, модернізація та реконструкція електричних мереж та обладнання. Будівництво та реконструкція мереж 35-110 кВ. п. 3. Реконструкція ПС 110 кВ Чумка

Implementation of building and installation works on the reconstruction of equipment SS 110/35/6 kW "Chumka" (2 Turns), Odessa, Transportnaya street, 3

IP 2018 І. Building, modernisation and reconstruction of electric networks and equipment. Building and reconstruction of networks of 35-110 kW. p. 3. A reconstruction SS 110 кВ Chumka

Expected value

UAH219,779,416.00

including VAT
Completed
Call for proposals

from Jun 22, 2018, 12:00

until Aug 30, 2018, 16:00

Prequalification

from Aug 30, 2018, 16:03

until Sep 25, 2018, 00:00

Auction

from Sep 25, 2018, 15:43

until Sep 25, 2018, 16:04

Qualification

from Sep 25, 2018, 16:04

until Oct 1, 2018, 13:34

Offers considered

from Oct 1, 2018, 13:34

until Oct 19, 2018, 13:27

Offers to be submitted:
Jun 22, 2018, 12:00 – Aug 30, 2018, 16:00
Auction launch:
Sep 25, 2018, 15:43 – Sep 25, 2018, 16:04
Clarification period:
Jun 22, 2018, 12:00 – Aug 20, 2018, 16:00
Answers till:
Aug 30, 2018, 16:00
Appealing tender terms:
Jun 22, 2018, 12:00 – Aug 26, 2018, 00:00

Pay attention!

00:00 - means the beginning of the day, not its end

Date of the last changes to the tender conditions:
Aug 22, 2018, 09:55

Show all important dates

Hide dates

Information about customer

Name:
EDRPOU code:
00131713
Web site:
Not indicated
Address:
Україна, 65031, Одеська область, м. Одеса, вул. Миколи Боровського, 28Б
Rating:
To leave a review about a company and see its rating, you must sign up or Sign in

Main contact

Name:
Наталія Бундаківська (Nataliya Bundakivska)
Language skills:
українська
Phone:
+380991102068
E-mail:
Fax:
Additional contracts
Name:
Стамат Роман Семенович (Стамат Роман Семенович)
Language skills:
українська
Phone:
+380487052552
E-mail:
Fax:
Name:
Любарська Олена Григорівна (Любарська Олена Григорівна)
Language skills:
українська
Phone:
+380487052538
E-mail:
Fax:

Show customer contacts

Hide customer contacts

Items list

Name Quantity Delivery Place of delivery
1

Виконання будівельно-монтажних робіт з реконструкції обладнання ПС 110/35/6 кВ «Чумка» (2 Черга), м. Одеса, вул. Транспортна, 3

Implementation of building and installation works on the reconstruction of equipment SS 110/35/6 kW "Chumka" (2 Turns), Odessa, Transportnaya street, 3

Code DK 021:2015: 45310000-3 Електромонтажні роботи

Quantity:

1 роботи

Delivery period:

Sep 7, 2018 – Dec 31, 2019

Place of delivery:

Україна, 65031, Одеська область, місто Одеса, вулиця Миколи Боровського, 28Б

Procurement documents

Document name Document type Date of publishing
Procurement documents Aug 15, 2018, 12:00
Not indicated Sep 25, 2018, 16:04
Not indicated Sep 25, 2018, 16:04
Procurement documents Aug 15, 2018, 12:00
Procurement documents Jun 22, 2018, 12:00
Procurement documents Jul 10, 2018, 16:36
Procurement documents Jul 20, 2018, 17:04
Procurement documents Jul 20, 2018, 17:04
Procurement documents Aug 22, 2018, 09:55
Procurement documents Aug 8, 2018, 10:41
Not indicated Aug 22, 2018, 09:55
Not indicated Aug 15, 2018, 12:01
Not indicated Aug 8, 2018, 10:42
Not indicated Aug 1, 2018, 16:52
Not indicated Jul 20, 2018, 17:04
Not indicated Jul 10, 2018, 16:36
Not indicated Jun 22, 2018, 12:01
Procurement documents Aug 1, 2018, 16:51
Procurement documents Jul 10, 2018, 16:36
Procurement documents Aug 22, 2018, 09:55
Procurement documents Aug 1, 2018, 16:51
Procurement documents Aug 8, 2018, 10:41

About tender

Complain ID prozorro:
Expected value:
UAH219,779,416.00 including VAT
Minimum price decrement:
UAH5,000.00
Bidding security:
UAH1,090,000.00
View reviews in Dozorro:

Show more information

Hide detailed information

Prequalification of participants

Qualification protocol generated Qualification protocol generated Sep 19, 2018

Name:
ТОВАРИСТВО З ОБМЕЖЕНОЮ ВІДПОВІДАЛЬНІСТЮ "ЕЛЕКТРОСВІТ"
E-mail: nataliya.fedora@elektrosvit.com.ua Phone: 0507340391 Web site: EDRPOU:
31789596

This company hasn't been reviewed yet, be the first to do so

To leave a review about a company and see its rating, you must sign up or Sign in

Documents submitted with the offer

Document name Document type Date of publishing
Price offer Aug 30, 2018, 14:12
Documents confirming of qualification Aug 30, 2018, 14:11
Documents confirming of qualification Aug 30, 2018, 14:12
Documents confirming of qualification Aug 30, 2018, 14:12
Technical specifications Aug 30, 2018, 14:12
Technical specifications Aug 30, 2018, 14:12
Not indicated Aug 30, 2018, 14:13
Documents confirming of qualification Aug 30, 2018, 14:11
Documents confirming of qualification Aug 30, 2018, 14:11

Protocol for access to trading

Document name Document type Date of publishing
Not indicated Sep 19, 2018, 16:53
Extract from the register Aug 30, 2018, 16:03
Not indicated Sep 19, 2018, 16:54

Status:

Allowed to participate
Name:
Корєнман Володимир Мусійович
E-mail: bastion-sk@mail.ru Phone: +380487657663 Fax:
+380487657663
Web site: EDRPOU:
37811845

This company hasn't been reviewed yet, be the first to do so

To leave a review about a company and see its rating, you must sign up or Sign in

Documents submitted with the offer

Document name Document type Date of publishing
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Not indicated Sep 26, 2018, 18:13
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:50
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:51
Technical specifications Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:50
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:49
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:48
Not indicated Sep 26, 2018, 18:03
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Documents confirming of qualification Aug 30, 2018, 14:49
Not indicated Sep 26, 2018, 18:46
Not indicated Aug 30, 2018, 15:51
Not indicated Aug 30, 2018, 15:04
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:49
Documents confirming of qualification Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:51
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:51
Documents confirming of qualification Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Not indicated Aug 30, 2018, 15:51
Not indicated Aug 30, 2018, 15:04
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:50
Compliance confirmation Aug 30, 2018, 15:23
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Not indicated Sep 26, 2018, 18:15
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46

Protocol for access to trading

Document name Document type Date of publishing
Not indicated Sep 19, 2018, 16:55
Not indicated Sep 19, 2018, 16:54
Extract from the register Aug 30, 2018, 16:03

Status:

Allowed to participate
ТОВ "Чорноморенергоспецмонтаж"

Auction history

Participants of auction

Name:
Корєнман Володимир Мусійович
E-mail: bastion-sk@mail.ru Phone: +380487657663 Fax:
+380487657663
Web site: EDRPOU:
37811845

This company hasn't been reviewed yet, be the first to do so

To leave a review about a company and see its rating, you must sign up or Sign in
Attention, the mark "CEP" does not determine the type of applied signature! If an outdated type of EDS is used, the name will still indicate "CEP"
Contract was uploaded and signed by the customer. Tender completed.

Documents submitted with the offer

Document name Document type Date of publishing
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Not indicated Sep 26, 2018, 18:13
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:50
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:51
Technical specifications Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:50
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:49
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:48
Not indicated Sep 26, 2018, 18:03
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Documents confirming of qualification Aug 30, 2018, 14:49
Not indicated Sep 26, 2018, 18:46
Not indicated Aug 30, 2018, 15:51
Not indicated Aug 30, 2018, 15:04
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:49
Documents confirming of qualification Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:51
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:51
Documents confirming of qualification Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Not indicated Aug 30, 2018, 15:51
Not indicated Aug 30, 2018, 15:04
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:50
Compliance confirmation Aug 30, 2018, 15:23
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Not indicated Sep 26, 2018, 18:15
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Documents confirming of qualification Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:47
Compliance confirmation Aug 30, 2018, 14:47
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Technical specifications Aug 30, 2018, 14:48
Technical specifications Aug 30, 2018, 14:48
Compliance confirmation Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:51
Compliance confirmation Aug 30, 2018, 14:46
Documents confirming of qualification Aug 30, 2018, 14:49
Technical specifications Aug 30, 2018, 14:46
Compliance confirmation Aug 30, 2018, 14:46

Decision of the responsible person

Document name Document type Date of publishing
Review Protocol Oct 1, 2018, 13:29
Extract from the register Sep 25, 2018, 16:04
Not indicated Oct 1, 2018, 13:34
Review Protocol Oct 1, 2018, 13:29

Contract

Document name Document type Date of publishing
Not indicated Oct 19, 2018, 13:27
Signed contract Oct 19, 2018, 13:25

Offer

UAH218,025,000.00 including VAT

Status

winner
ТОВ "Чорноморенергоспецмонтаж"
Name:
ТОВАРИСТВО З ОБМЕЖЕНОЮ ВІДПОВІДАЛЬНІСТЮ "ЕЛЕКТРОСВІТ"
E-mail: nataliya.fedora@elektrosvit.com.ua Phone: 0507340391 Web site: EDRPOU:
31789596

This company hasn't been reviewed yet, be the first to do so

To leave a review about a company and see its rating, you must sign up or Sign in
Attention, the mark "CEP" does not determine the type of applied signature! If an outdated type of EDS is used, the name will still indicate "CEP"

Documents submitted with the offer

Document name Document type Date of publishing
Price offer Aug 30, 2018, 14:12
Documents confirming of qualification Aug 30, 2018, 14:11
Documents confirming of qualification Aug 30, 2018, 14:12
Documents confirming of qualification Aug 30, 2018, 14:12
Technical specifications Aug 30, 2018, 14:12
Technical specifications Aug 30, 2018, 14:12
Not indicated Aug 30, 2018, 14:13
Documents confirming of qualification Aug 30, 2018, 14:11
Documents confirming of qualification Aug 30, 2018, 14:11

Offer

UAH218,040,000.00 including VAT

Status

Not considered

Contract

Useful links

Public procurements list of the client Акціонерне товариство "Одесаобленерго"