Труби сталеві попередньо ізольовані спіненим поліуретаном в поліетиленовій оболонці для теплових мереж IV та III категорії з системою сигналізації ушкоджень Ø 530/710 мм та комплект стиків для труб сталевих попередньо ізольованих спіненим поліуретаном в
поліетиленовій оболонці для теплових мереж IV та III категорії з системою сигналізації ушкоджень Ø 530/710 мм
Steel pipes pre-insulated with polyurethane foam in a plastic shell for heating systems IV and III category of damage alarm system Ø 530/710 mm and a set of joints for steel pipes pre-insulated with polyurethane foam in a plastic shell for heating systems IV and III category of damage alarm system Ø 530/710 mm
UAH4,667,959.08
including VATfrom Apr 18, 2017, 16:58
until Jun 2, 2017, 17:03
from Jun 16, 2017, 16:18
until Jul 13, 2017, 00:00
from Aug 7, 2017, 15:56
until Aug 7, 2017, 16:17
from Aug 7, 2017, 16:17
until Aug 9, 2017, 16:49
from Aug 9, 2017, 16:49
until Aug 21, 2017, 08:08
Pay attention!
00:00 - means the beginning of the day, not its end
Show all important dates
Hide dates
Information about customer
Main contact
Show customer contacts
Hide customer contacts
Items list
№ | Name | Quantity | Delivery | Place of delivery |
---|---|---|---|---|
1 |
Труби сталеві попередньо ізольовані спіненим поліуретаном в поліетиленовій оболонці для теплових мереж IV та III категорії з системою сигналізації ушкоджень Ø 530/710 мм Steel pipes pre-insulated with polyurethane foam in a plastic shell for heating systems IV and III category of damage alarm system Ø 530/710 mm
Code DK 021:2015:
44160000-9 Магістралі, трубопроводи, труби, обсадні труби, тюбінги та супутні вироби
|
Quantity: 642 пог. метр |
Delivery period:
Jun 1, 2017 – Dec 31, 2017
|
Place of delivery: Україна, 14014, Чернігівська область, місто Чернігів, вулиця Ушинського, 23 |
2 |
Комплект стиків для труб сталевих попередньо ізольованих спіненим поліуретаном в поліетиленовій оболонці для теплових мереж IV та III категорії з системою сигналізації ушкоджень Ø 530/710 мм Set of joints for steel pipes pre-insulated with polyurethane foam in a plastic shell for heating systems IV and III category of damage alarm system Ø 530/710 mm
Code DK 021:2015:
44160000-9 Магістралі, трубопроводи, труби, обсадні труби, тюбінги та супутні вироби
|
Quantity: 60 од |
Delivery period:
Jun 1, 2017 – Dec 31, 2017
|
Place of delivery: Україна, 14014, Чернігівська область, місто Чернігів, вулиця Ушинського, 23 |
Procurement documents
Document name | Document type | Date of publishing |
Not indicated | May 17, 2017, 16:49 | |
Not indicated | May 24, 2017, 13:59 | |
Not indicated | Aug 7, 2017, 16:17 | |
Not indicated | Aug 7, 2017, 16:17 | |
|
||
Not indicated | Apr 18, 2017, 16:59 | |
Not indicated | May 24, 2017, 14:09 | |
Not indicated | May 24, 2017, 13:59 | |
|
||
Not indicated | May 24, 2017, 13:59 | |
Not indicated | May 17, 2017, 16:49 | |
Not indicated | May 24, 2017, 14:15 | |
Not indicated | May 17, 2017, 16:55 | |
Not indicated | Apr 18, 2017, 17:12 | |
|
||
Not indicated | May 17, 2017, 16:49 |
About tender
Show more information
Hide detailed information
Prequalification of participants
Qualification protocol generated Qualification protocol generated Jul 7, 2017
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Not indicated | May 24, 2017, 14:13 | |
Not indicated | May 19, 2017, 10:48 | |
|
||
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 | |
Documents confirming of qualification | May 11, 2017, 17:50 |
Protocol for access to trading
Document name | Document type | Date of publishing |
Not indicated | Jul 7, 2017, 15:37 | |
Not indicated | Jul 7, 2017, 15:39 | |
Extract from the register | Jun 16, 2017, 16:19 |
Status:
disqualified
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:14 | |
Not indicated | Aug 11, 2017, 14:41 | |
Not indicated | Aug 14, 2017, 14:32 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Not indicated | Aug 8, 2017, 11:56 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Price offer | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Technical specifications | May 31, 2017, 17:15 | |
Not indicated | May 31, 2017, 17:16 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Not indicated | Aug 11, 2017, 14:41 |
Protocol for access to trading
Document name | Document type | Date of publishing |
Extract from the register | Jun 16, 2017, 16:19 | |
Not indicated | Jul 7, 2017, 15:37 | |
Not indicated | Jul 7, 2017, 15:38 |
Status:
Allowed to participate
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Not indicated | Jun 2, 2017, 12:45 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Compliance confirmation | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:43 | |
Price offer | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 |
Protocol for access to trading
Document name | Document type | Date of publishing |
Not indicated | Jul 7, 2017, 15:39 | |
Extract from the register | Jun 16, 2017, 16:19 | |
Not indicated | Jul 7, 2017, 15:36 |
Status:
Allowed to participate
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:58 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:58 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:58 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:58 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:58 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 | |
Documents confirming of qualification | Jun 2, 2017, 16:56 | |
Documents confirming of qualification | Jun 2, 2017, 16:57 |
Protocol for access to trading
Document name | Document type | Date of publishing |
Not indicated | Jul 7, 2017, 15:40 | |
Extract from the register | Jun 16, 2017, 16:19 | |
Not indicated | Jul 7, 2017, 15:37 |
Status:
disqualifiedAuction history
View
Participants of auction
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:14 | |
Not indicated | Aug 11, 2017, 14:41 | |
Not indicated | Aug 14, 2017, 14:32 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Not indicated | Aug 8, 2017, 11:56 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Documents confirming of qualification | May 31, 2017, 17:15 | |
Price offer | May 31, 2017, 17:15 | |
Not indicated | Aug 11, 2017, 14:41 | |
Technical specifications | May 31, 2017, 17:15 | |
Not indicated | May 31, 2017, 17:16 | |
Technical specifications | May 31, 2017, 17:14 | |
Technical specifications | May 31, 2017, 17:15 | |
Documents confirming of qualification | May 31, 2017, 17:14 | |
Not indicated | Aug 11, 2017, 14:41 |
Decision of the responsible person
Document name | Document type | Date of publishing |
Not indicated | Aug 9, 2017, 16:31 | |
Not indicated | Aug 9, 2017, 16:49 | |
Extract from the register | Aug 7, 2017, 16:17 |
Offer
Status
winner
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Not indicated | Jun 2, 2017, 12:45 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Compliance confirmation | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:43 | |
Price offer | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Technical specifications | Jun 2, 2017, 12:43 | |
Documents confirming of qualification | Jun 2, 2017, 12:42 |
Offer
Status
Not consideredContract
View of the contract
Useful links
Public procurements list of the client ТОВ ФІРМА "ТЕХНОВА"You may be interested
UAH3,774,014.00 including VAT
ViewUAH3,268,000.00 including VAT
ViewUAH7,924,766.00 including VAT
View