Lot

ЛОТ 8. Труби сталеві попередньо теплоізольовані та комплектуючі до них в асортименті (РМТМ), відповідний код 44161000-6

Expected value

UAH45,811,000.00

including VAT
Completed
Call for proposals

from Apr 12, 16:42

until Apr 23, 09:00

Auction

from Apr 24, 12:05

until Apr 24, 12:28

Qualification

from Apr 24, 16:14

until Apr 29, 16:40

Offers considered

from Apr 29, 16:40

until May 16, 11:53

Offers to be submitted:
Apr 12, 16:42 – Apr 23, 09:00
Auction launch:
Apr 24, 12:05 – Apr 24, 12:28
Clarification period:
Apr 12, 16:42 – Apr 20, 00:00

Pay attention!

00:00 - means the beginning of the day, not its end

Replies to inquiries before:
Apr 23, 09:00
Appealing tender terms:
Apr 12, 16:42 – Apr 20, 00:00

Pay attention!

00:00 - means the beginning of the day, not its end

Date of the last changes to the tender conditions:
Apr 18, 17:13

Show all important dates

Hide dates

Information about customer

Name:
EDRPOU code:
05506460
Web site:
Address:
Україна, 79040, Львівська область, Львів, вул.Данила Апостола 1
Rating:
To leave a review about a company and see its rating, you must sign up or Sign in

Main contact

Name:
Назар Милян
Language skills:
Phone:
+380673991677
E-mail:
Fax:

Show customer contacts

Hide customer contacts

Purchase information

Expected value:
UAH5,333,000.00 including VAT
Minimum price decrement:
UAH53,330.00
ID procurement:
UA-2024-04-12-010863-a

Items list

Name Quantity Delivery Place of delivery
1

Труби сталеві попередньо теплоізольовані та комплектуючі до них в асортименті (РМТМ), відповідний код 44161000-6

Code DK 021:2015: 44160000-9 Магістралі, трубопроводи, труби, обсадні труби, тюбінги та супутні вироби

Quantity:

278 одиниця

Delivery period:

до Dec 31

Place of delivery:

Україна, 79040, Львівська область, львів, Данила Апостола, 1

Procurement documents

Document name Document type Date of publishing
Not indicated Apr 24, 16:14
Not indicated Apr 24, 14:06
Not indicated Apr 18, 17:13
Not indicated Apr 12, 16:51
Draft contract Apr 18, 17:11
Draft contract Apr 12, 16:44
Not indicated Apr 24, 11:31
Not indicated Apr 24, 15:09
Not indicated Apr 24, 12:28
Apr 12, 16:44
Not indicated Apr 24, 13:57
Not indicated Apr 24, 13:03
Not indicated Apr 24, 12:14
Not indicated Apr 24, 15:47
Not indicated Apr 24, 14:29
Technical specifications Apr 18, 17:11
Technical specifications Apr 12, 16:44
Procurement documents Apr 18, 17:11
Procurement documents Apr 12, 16:44
Not indicated Apr 24, 14:23
Not indicated Apr 18, 17:10

Terms of payment lot

Payment after the event:
delivery of goods
Payment type:
postpayment
Payment amount:
100%
Period (in days):
210 ( calendar )
Description:
Після поставки Товару протягом поточного року, але не пізніше 31.12.2024р.

Item documentation

Document name Document type Date of publishing
Draft contract Apr 18, 17:11
Draft contract Apr 12, 16:44
Technical specifications Apr 18, 17:11
Technical specifications Apr 12, 16:44
Not indicated Apr 18, 17:10
Apr 12, 16:44
Procurement documents Apr 18, 17:11
Procurement documents Apr 12, 16:44

Auction history

Participants of auction

Name:
ТОВ Термо Ізол
E-mail: teplo@elplast.com.ua Phone: +380323132249 Fax:
+380323132249
EDRPOU:
35009379

This company hasn't been reviewed yet, be the first to do so

To leave a review about a company and see its rating, you must sign up or Sign in
Attention, the mark "CEP" does not determine the type of applied signature! If an outdated type of EDS is used, the name will still indicate "CEP"
Contract was uploaded and signed by the customer. Tender completed.

Documents submitted with the offer

Document name Document type Date of publishing
Compliance confirmation Apr 22, 22:41
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:44
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 17:45
Compliance confirmation Apr 30, 15:48
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 22:41
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 18:04
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 15:48
Compliance confirmation Apr 22, 22:41
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 15:48
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 21:56
Compliance confirmation Apr 22, 17:45
Technical specifications Apr 22, 18:04
Technical specifications Apr 22, 18:05
Compliance confirmation Apr 22, 17:45
Compliance confirmation Apr 30, 15:58
Compliance confirmation Apr 30, 15:57
Compliance confirmation Apr 30, 14:03
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Documents confirming of qualification Apr 22, 17:45
Compliance confirmation Apr 30, 15:57
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 18:04
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 17:45
Technical specifications Apr 22, 18:05
Documents confirming of qualification Apr 22, 17:45
Technical specifications Apr 22, 17:45
Price offer Apr 22, 21:56
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 22:41
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 21:56
Compliance confirmation Apr 30, 15:58
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 21:56
Compliance confirmation Apr 22, 17:45
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 17:45
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 14:08
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 14:08
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 21:56
Compliance confirmation Apr 30, 14:03
Technical specifications Apr 22, 22:41
Technical specifications Apr 22, 18:04
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 15:57
Compliance confirmation Apr 30, 14:03
Compliance confirmation Apr 22, 21:56
Technical specifications Apr 22, 18:04
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 14:08
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 21:56
Compliance confirmation Apr 30, 15:48
Technical specifications Apr 22, 21:56
Compliance confirmation Apr 22, 23:58
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 23:58
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 22:41
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 14:03
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 30, 14:08
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 21:56
Compliance confirmation Apr 22, 17:45
Compliance confirmation Apr 30, 14:03
Compliance confirmation Apr 30, 15:47
Compliance confirmation Apr 22, 17:45
Technical specifications Apr 22, 22:57
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Compliance confirmation Apr 22, 21:56
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 21:56
Technical specifications Apr 22, 18:05
Compliance confirmation Apr 22, 17:45
Price offer Apr 22, 22:57
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:05
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 18:04
Not indicated Apr 30, 16:40
Not indicated Apr 30, 15:50
Not indicated Apr 30, 14:10
Not indicated Apr 30, 14:06
Not indicated Apr 23, 00:02
Not indicated Apr 22, 23:02
Technical specifications Apr 22, 18:05
Compliance confirmation Apr 30, 14:08
Technical specifications Apr 22, 17:45
Technical specifications Apr 22, 21:56
Compliance confirmation Apr 22, 23:58

Decision of the responsible person

Document name Document type Date of publishing
Not indicated Apr 29, 16:15
Reference of NAZK
PDF version accepted in personal account
Reference Apr 29, 16:16
Extract from the register Apr 24, 16:16
Review Protocol Apr 29, 16:14

Answers to requirements for purchase criteria

Requirements for the procurement participant
9 requirements
Вчинення злочинів, учинених з корисливих мотивів
Керівник учасника процедури закупівлі не був засуджений за кримінальне правопорушення, вчинене з корисливих мотивів (зокрема, пов’язане з хабарництвом, шахрайством та відмиванням коштів), судимість з якого не знято або не погашено в установленому законом порядку
Вчинення економічних правопорушень
Суб’єкт господарювання (учасник процедури закупівлі) протягом останніх трьох років не притягувався до відповідальності за порушення, передбачене пунктом 4 частини другої статті 6, пунктом 1 статті 50 Закону України "Про захист економічної конкуренції", у вигляді вчинення антиконкурентних узгоджених дій, що стосуються спотворення результатів тендерів
Вчинення корупційних правопорушень
Відомості про юридичну особу, яка є учасником процедури закупівлі, не внесено до Єдиного державного реєстру осіб, які вчинили корупційні або пов'язані з корупцією правопорушення
Вчинення правопорушень, пов'язаних з використанням дитячої праці чи будь-якими формами торгівлі людьми
Керівника учасника процедури закупівлі, фізичну особу, яка є учасником процедури закупівлі, не було притягнуто згідно із законом до відповідальності за вчинення правопорушення, пов’язаного з використанням дитячої праці чи будь-якими формами торгівлі людьми
Порушення справ про банкрутство
Учасник процедури закупівлі не визнаний у встановленому законом порядку банкрутом та стосовно нього не відкрита ліквідаційна процедура
Наявність інших підстав для відмови в участі у процедурі закупівлі
У Єдиному державному реєстрі юридичних осіб, фізичних осіб - підприємців та громадських формувань присутня інформація, передбачена пунктом 9 частини другої статті 9 Закону України "Про державну реєстрацію юридичних осіб, фізичних осіб - підприємців та громадських формувань" (крім нерезидентів)
Мова (мови), якою (якими) повинні готуватися тендерні пропозиції
Мова тендерної пропозиції українська

Offer:

UAH5,039,685.00 including VAT

Status:

winner
Name:
ТОВ "Перший трубний завод"
E-mail: PTZ1@UKR.NET Phone: 380675005552 Web site: EDRPOU:
34427263

Not enough reviews to form a rating

1
To leave a review about a company and see its rating, you must sign up or Sign in
Attention, the mark "CEP" does not determine the type of applied signature! If an outdated type of EDS is used, the name will still indicate "CEP"

Documents submitted with the offer

Document name Document type Date of publishing
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:21
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Not indicated May 1, 16:26
Not indicated Apr 23, 08:21
Not indicated Apr 22, 16:17
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:20
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:20
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:20
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:21
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 23, 08:20
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:20
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:21
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Not indicated Apr 23, 08:21
Not indicated Apr 22, 16:17
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 23, 08:20
Documents confirming of qualification May 1, 16:25
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:21
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:21
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Documents confirming of qualification May 1, 16:25
Documents confirming of qualification May 1, 16:24
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:24
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 23, 08:20
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Technical specifications Apr 22, 16:00
Documents confirming of qualification May 1, 16:25

Answers to requirements for purchase criteria

Requirements for the procurement participant
9 requirements
Вчинення злочинів, учинених з корисливих мотивів
Керівник учасника процедури закупівлі не був засуджений за кримінальне правопорушення, вчинене з корисливих мотивів (зокрема, пов’язане з хабарництвом, шахрайством та відмиванням коштів), судимість з якого не знято або не погашено в установленому законом порядку
Вчинення економічних правопорушень
Суб’єкт господарювання (учасник процедури закупівлі) протягом останніх трьох років не притягувався до відповідальності за порушення, передбачене пунктом 4 частини другої статті 6, пунктом 1 статті 50 Закону України "Про захист економічної конкуренції", у вигляді вчинення антиконкурентних узгоджених дій, що стосуються спотворення результатів тендерів
Вчинення корупційних правопорушень
Відомості про юридичну особу, яка є учасником процедури закупівлі, не внесено до Єдиного державного реєстру осіб, які вчинили корупційні або пов'язані з корупцією правопорушення
Вчинення правопорушень, пов'язаних з використанням дитячої праці чи будь-якими формами торгівлі людьми
Керівника учасника процедури закупівлі, фізичну особу, яка є учасником процедури закупівлі, не було притягнуто згідно із законом до відповідальності за вчинення правопорушення, пов’язаного з використанням дитячої праці чи будь-якими формами торгівлі людьми
Порушення справ про банкрутство
Учасник процедури закупівлі не визнаний у встановленому законом порядку банкрутом та стосовно нього не відкрита ліквідаційна процедура
Наявність інших підстав для відмови в участі у процедурі закупівлі
У Єдиному державному реєстрі юридичних осіб, фізичних осіб - підприємців та громадських формувань присутня інформація, передбачена пунктом 9 частини другої статті 9 Закону України "Про державну реєстрацію юридичних осіб, фізичних осіб - підприємців та громадських формувань" (крім нерезидентів)
Мова (мови), якою (якими) повинні готуватися тендерні пропозиції
Мова тендерної пропозиції українська

Offer:

UAH5,238,924.00 including VAT
сібпідрядники не залучаються

Status:

Not considered

Contract