Запірна та запобіжна арматура
UAH1,406,270.00
including VATfrom Oct 27, 2023, 15:58
until Nov 4, 2023, 09:00
from Nov 6, 2023, 14:27
until Nov 6, 2023, 14:50
from Nov 6, 2023, 14:50
until Nov 14, 2023, 13:39
from Nov 14, 2023, 13:39
until Nov 20, 2023, 14:17
Pay attention!
00:00 - means the beginning of the day, not its end
Pay attention!
00:00 - means the beginning of the day, not its end
Show all important dates
Hide dates
Information about customer
Main contact
Show customer contacts
Hide customer contacts
Purchase information
Items list
№ | Name | Quantity | Delivery | Place of delivery |
---|---|---|---|---|
1 |
Вентиль муфтовий 15кч18п Ду20 мм Ру16
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 116 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
2 |
Вентиль муфтовий 15кч18п Ду25 мм Ру16
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 19 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
3 |
Вентиль муфтовий 15кч18п Ду32 мм Ру16
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 2 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
4 |
Вентиль шаровий фланцевий Ду32 мм Ру25
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 10 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
5 |
Вентиль 15КЧ18П Ду50 Ру16 муфтовий
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 174 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
6 |
Вентиль 15КЧ19П Ду50 Ру16 фланцевий
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 36 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
7 |
Засувка 30Ч6БР Ду50 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 29 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
8 |
Засувка 30Ч6БР Ду80 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 25 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
9 |
Засувка 30Ч6БР Ду100 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 48 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
10 |
Засувка 30Ч6БР Ду150 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 56 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
11 |
Засувка 30Ч6БР Ду200 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 9 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
12 |
Засувка 30Ч6БР Ду250 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 2 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
13 |
Засувка 30Ч6БР Ду300 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 2 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
14 |
Зворотній клапан Ду150 мм Ру16
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 3 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
15 |
Зворотній клапан Ду100 мм Ру16
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 4 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
16 |
Зворотній клапан Ду50 мм муфтовий
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 5 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
17 |
Зворотній клапан Ду50 мм фланцевий
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 11 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
18 |
Фланець сталевий Ду50 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 102 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
19 |
Фланець сталевий Ду80 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 41 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
20 |
Фланець сталевий Ду100 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 110 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
21 |
Фланець сталевий Ду150 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 48 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
22 |
Фланець сталевий Ду200 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 18 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
23 |
Фланець сталевий Ду250 Ру10
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 3 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
24 |
Кран Ду25 PPR
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 44 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
25 |
Кран Ду50 PPR
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 32 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
26 |
Кран Ду63 PPR
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 124 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
27 |
Кран Ду75 PPR
Code DK 021:2015:
42130000-9 Арматура трубопровідна: крани, вентилі, клапани та подібні пристрої
|
Quantity: 8 штуки |
Delivery period:
до Dec 31, 2023
|
Place of delivery: Україна, 85001, Донецька область, Добропілля, пров.Луганський буд 2А |
Procurement documents
Document name | Document type | Date of publishing |
Not indicated | Oct 27, 2023, 16:03 | |
Technical specifications | Oct 27, 2023, 15:58 | |
Oct 27, 2023, 15:58 | ||
Draft contract | Oct 27, 2023, 15:58 | |
Not indicated | Nov 6, 2023, 14:50 | |
Procurement documents | Oct 27, 2023, 15:58 | |
Procurement documents | Oct 27, 2023, 15:58 |
Terms of payment lot
Auction history
View
Participants of auction
Documents submitted with the offer
Document name | Document type | Date of publishing |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 20, 2023, 11:12 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Price offer | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Not indicated | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Price offer | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 20, 2023, 11:12 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Not indicated | Nov 20, 2023, 11:12 | |
Not indicated | Nov 17, 2023, 10:21 | |
Not indicated | Nov 17, 2023, 10:18 | |
Not indicated | Nov 3, 2023, 16:19 | |
|
||
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Technical specifications | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 | |
Documents confirming of qualification | Nov 3, 2023, 16:19 | |
Documents confirming of qualification | Nov 17, 2023, 10:18 |
Decision of the responsible person
Document name | Document type | Date of publishing |
Reference of NAZK
PDF version accepted in
personal account
|
Reference | Nov 14, 2023, 13:39 |
Not indicated | Nov 14, 2023, 13:39 | |
Not indicated | Nov 13, 2023, 12:29 | |
|
||
Review Protocol | Nov 13, 2023, 12:27 | |
Extract from the register | Nov 6, 2023, 14:54 | |
Review Protocol | Nov 14, 2023, 13:36 |
Contract
Document name | Document type | Date of publishing |
Not indicated | Nov 20, 2023, 14:15 | |
Not indicated | Nov 20, 2023, 14:17 |
Answers to requirements for purchase criteria
Offer:
Status:
winner
Documents submitted with the offer
Document name | Document type | Date of publishing |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Technical specifications | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:52 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:52 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Compliance confirmation | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Not indicated | Nov 2, 2023, 22:49 | |
Documents confirming of qualification | Nov 2, 2023, 22:49 | |