44160000 - 9 Магістралі, трубопроводи, труби, обсадні труби, тюбінги та супутні вироби Труби водопровідні та каналізаційні
UAH20,398,791.38
including VATfrom Nov 30, 2022, 10:13
until Dec 8, 2022, 18:00
from Dec 9, 2022, 13:33
until Dec 9, 2022, 13:56
from Dec 9, 2022, 13:56
until Dec 15, 2022, 13:42
from Dec 15, 2022, 13:42
until Dec 28, 2022, 10:32
Pay attention!
00:00 - means the beginning of the day, not its end
Pay attention!
00:00 - means the beginning of the day, not its end
Show all important dates
Hide dates
Information about customer
Main contact
Show customer contacts
Hide customer contacts
Purchase information
Items list
№ | Name | Quantity | Delivery | Place of delivery |
---|---|---|---|---|
1 |
Труба Пе 100 SDR 13,6 - 25*2,0 мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 400 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
2 |
Труба Пе 100 SDR 17 - 32*2,0 мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 400 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
3 |
Труба Пе 100 SDR 17 - 40*2,4мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 400 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
4 |
Труба Пе 100 SDR 17 - 50*3,0 мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 500 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
5 |
Труба Пе 100 SDR 17 - 63*3,8 мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 300 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
6 |
Труба Пе 100 SDR 17 - 75*4,5 мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 300 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
7 |
Труба Пе 100 SDR 17 - 90*5,4 мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 300 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
8 |
Труба Пе 100 SDR 17 - 110*6,6 мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 500 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
9 |
Труба Пе 100 SDR 17 - 160*мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 2,000 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
10 |
Труба Пе 100 SDR 17 - 225*13,4мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 2,000 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
11 |
Труба Пе 100 SDR 17 - 335*21,1мм
Code DK 021:2015:
44163100-1 Труби
|
Quantity: 5,000 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
12 |
Труба ПВХ d160х3,2х3000 мм для зовнішньої каналізації з розтрубом SN2
Code DK 021:2015:
44163130-0 Каналізаційні труби
|
Quantity: 180 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
13 |
Труба ПВХ d200х3,9х3000 мм для зовнішньої каналізації з розтрубом SN2
Code DK 021:2015:
44163130-0 Каналізаційні труби
|
Quantity: 150 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
14 |
Труба ПВХ d250х4,9х3000 мм для зовнішньої каналізації з розтрубом SN2
Code DK 021:2015:
44163130-0 Каналізаційні труби
|
Quantity: 150 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
15 |
Труба Е2К двошарова гофрована для каналізації з ПП dn=315 SN-8 ( L=6м , у комплекті з муфтою та двома ущільнюючими кільцями )
Code DK 021:2015:
44163130-0 Каналізаційні труби
|
Quantity: 120 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
16 |
Труба Е2К двошарова гофрована для каналізації з ПП dn=160 SN-8 ( L=6м , у комплекті з муфтою та двома ущільнюючими кільцями )
Code DK 021:2015:
44163130-0 Каналізаційні труби
|
Quantity: 180 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
17 |
Труба Е2К двошарова гофрована для каналізації з ПП dn=200 SN-8 ( L=6м , у комплекті з муфтою та двома ущільнюючими кільцями )
Code DK 021:2015:
44163130-0 Каналізаційні труби
|
Quantity: 120 метри |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
18 |
Втулка під фланець ПЕ100 SDR17 Д=160
Code DK 021:2015:
44167110-2 Фланці
|
Quantity: 10 штуки |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
19 |
Фланець сталевий вільний на ПЕ втулку Ду160 1.0 Мпа
Code DK 021:2015:
44167110-2 Фланці
|
Quantity: 10 штуки |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
20 |
Муфта терморезисторна D 160 SDR 17 ПЕ 100
Code DK 021:2015:
44167100-9 Муфти
|
Quantity: 10 штуки |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
21 |
Фланець плоский приварний зі сталі PN 10 Д=300
Code DK 021:2015:
44167110-2 Фланці
|
Quantity: 3 штуки |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
22 |
Перехід ПЕ/сталь 355/300
Code DK 021:2015:
44167000-8 Трубна арматура різна
|
Quantity: 3 штуки |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
23 |
Хомут компресійний ПЕ Д 160*2’’
Code DK 021:2015:
44167200-0 Ремонтні хомути та манжети
|
Quantity: 5 штуки |
Delivery period:
Jan 1, 2023 – Dec 31, 2023
|
Place of delivery: Україна, 37604, Полтавська область, м.Миргород, вул. Шишацька, 82 |
Procurement documents
Document name | Document type | Date of publishing |
Not indicated | Nov 30, 2022, 10:13 | |
Draft contract | Nov 30, 2022, 10:13 | |
Technical specifications | Nov 30, 2022, 10:13 | |
Procurement documents | Nov 30, 2022, 10:14 | |
Not indicated | Dec 9, 2022, 13:56 | |
Not indicated | Nov 30, 2022, 10:15 |
Terms of payment lot
Auction history
View
Participants of auction
Documents submitted with the offer
Document name | Document type | Date of publishing |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Compliance confirmation | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Not indicated | Dec 8, 2022, 14:33 | |
Compliance confirmation | Dec 8, 2022, 14:32 | |
Compliance confirmation | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Compliance confirmation | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Compliance confirmation | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Compliance confirmation | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:32 |
Decision of the responsible person
Document name | Document type | Date of publishing |
License | Dec 13, 2022, 12:29 | |
Extract from the register | Dec 9, 2022, 13:56 | |
Not indicated | Dec 13, 2022, 12:31 |
Answers to requirements for purchase criteria
Offer:
Status:
disqualified
Documents submitted with the offer
Document name | Document type | Date of publishing |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:48 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Documents confirming of qualification | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:48 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:48 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Technical specifications | Dec 8, 2022, 14:48 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Documents confirming of qualification | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:48 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Documents confirming of qualification | Dec 8, 2022, 14:47 | |
Documents confirming of qualification | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Compliance confirmation | Dec 8, 2022, 14:45 | |
Not indicated | Dec 16, 2022, 14:34 | |
Not indicated | Dec 8, 2022, 14:53 | |
|
||
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:50 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Documents confirming of qualification | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Documents confirming of qualification | Dec 8, 2022, 14:47 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Documents confirming of qualification | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:50 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Documents confirming of qualification | Dec 8, 2022, 14:47 | |
Technical specifications | Dec 8, 2022, 14:50 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 16, 2022, 14:32 | |
Technical specifications | Dec 8, 2022, 14:50 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Compliance confirmation | Dec 8, 2022, 14:46 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Compliance confirmation | Dec 8, 2022, 14:45 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:51 | |
Compliance confirmation | Dec 8, 2022, 14:45 | |
Compliance confirmation | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:49 | |
Technical specifications | Dec 8, 2022, 14:40 | |
Technical specifications | Dec 8, 2022, 14:50 |
Decision of the responsible person
Document name | Document type | Date of publishing |
Not indicated | Dec 15, 2022, 13:42 | |
Extract from the register | Dec 13, 2022, 12:33 | |
License | Dec 15, 2022, 13:42 |
Contract
Document name | Document type | Date of publishing |
Not indicated | Dec 28, 2022, 10:32 | |
Signed contract | Dec 28, 2022, 10:30 |
Answers to requirements for purchase criteria
Offer:
Status:
winnerContract
View of the contract